Construction has begun and future planning is progressing for our three phase warehouse complex in Belleville, ON. Construction of Phase I is to be completed by the end of this year. The facility is designed for short term or long term storage of raw materials of finished goods.
KEY SITE FEATURES
LOCATION
Site: Belleville, ON – 1.5 hours east of Toronto along the Toronto/Montreal corridor.
FOOTPRINT
Phase I (Building A)
207,660 s/f – Q4 – 2019
Phase II (Building B)
207,660 s/f – Q4 – 2020
Phase III (Building C)
165,000 s/f – Q4- 2020
BUILDING CONSTRUCTION
Built to Food grade specification
BRC – Storage & distribution standards
Non- combustible construction
SECURITY
Full perimeter fence
Gated entry system
Driver Camera recognition
Card system
If you would like to find out more information about the facility, please contact us.